Logo of Phnom Penh Post newspaper Phnom Penh Post - UN: North Korea appears to have restarted reactor



UN: North Korea appears to have restarted reactor

Content image - Phnom Penh Post
North Korean leader Kim Jong Un offered to dismantle part of the Yongbyon complex at a second summit with then US president Donald Trump in exchange for sanctions relief, and his offer was rejected. AFP/File

UN: North Korea appears to have restarted reactor

Nuclear-armed North Korea appears to have restarted its plutonium-producing reprocessing reactor in a “deeply troubling” development, the UN atomic agency has said, a possible sign Pyongyang is expanding its banned weapons programme.

The development on the 5MW reactor in Yongbyon – North Korea’s main nuclear complex – comes with nuclear talks between Pyongyang and Washington at a standstill.

North Korean leader Kim Jong-un offered to dismantle part of the Yongbyon complex at a second summit with then US president Donald Trump but not other sites, in exchange for sanctions relief, and his offer was rejected.

North Korea is under multiple sets of international sanctions over its nuclear weapons and ballistic missile programmes, which have seen rapid progress under Kim.

“Since early July, there have been indications, including the discharge of cooling water, consistent with the operation of the reactor,” the International Atomic Energy Agency (IAEA) said in its annual report.

The Yongbyon reactor appeared to have been inactive from December 2018 until then, added the report dated August 27.

IAEA inspectors were kicked out of North Korea in 2009, and the agency has since monitored it from outside.

The possible operation of the reactor follows a recent indication that Pyongyang is also using a nearby radiochemical laboratory to separate plutonium from spent fuel previously removed from the reactor.

The signs of the reactor and laboratory operations were “deeply troubling”, the IAEA said, adding the activities were a “clear violation” of UN resolutions.

About 100km north of Pyongyang, Yongbyon is home to the country’s first nuclear reactor, and is the only known source of plutonium for North Korea’s weapons programme.

Yongbyon is not believed to be North Korea’s only uranium enrichment facility and closing it down would not in and of itself signal an end to the country’s atomic programme.

North Korea suspended nuclear and missile testing during a diplomatic process in 2018 but said it was abandoning its self-declared moratorium in January 2020.

It has subsequently carried out a series of short-range missile launches but has not conducted a nuclear test since 2017.

MOST VIEWED

  • Angkor lifetime pass, special Siem Reap travel offers planned

    The Ministry of Tourism plans to introduce a convenient, single lifetime pass for foreign travellers to visit Angkor Archaeological Park and potentially other areas. The move is designed to stimulate tourism to the culturally rich province of Siem Reap as the start of the “Visit

  • Bosba: The first Khmer woman composer from UK’s Cambridge

    Bosba Panh is just 25 years old, but she’s already accomplished some impressive milestones for herself and the Kingdom. On July 24, she graduated with a Master’s degree from the University of Cambridge as the first Khmer woman composer and Khmer music graduate ever at

  • Pailin longan winery tries to break through to the big time

    Longan aren’t quite as glamorous as some fruits. They don’t have the star-power of mangos or generate the excitement of a pricey seasonal niche fruit like the pungent durian. Unlike bananas or oranges, which are known and loved everywhere, longan remains a decidedly

  • ‘Golden’ Angkor Wat likely due to natural phenomenon: ANA

    Pictures and video clips of the Angkor Wat temple, its spires seemingly coated in gold, have been shared tens of thousands of times on social media, prompting a sense of wonder among those who have seen them. Hong Sam Ath, who took the pictures and

  • Debt restructuring over, time to tackle rising NPL ratio

    The Cambodian banking system has just completed a 26-month debt restructuring exercise where scores of loan accounts were revised, classified and provisioned as the rate of non-performing loans inched up, sparking a slight credit risk unease Implemented in April 2020, the Covid-19 debt restructuring measures came

  • Recap of this year’s ASEAN FM meet and look ahead

    This year’s edition of the ASEAN Foreign Ministers’ Meeting (AMM) hosted by Cambodia comes against the backdrop of heightened global tensions and increasing rivalry between major powers that have been compared to the animosity of the Cold War era. The following is The Post’