Logo of Phnom Penh Post newspaper Phnom Penh Post - Reaching for the sky has its limits at Olympia



Reaching for the sky has its limits at Olympia

OCIC’s sprawling Olympia City development appears to be running into some problems.
OCIC’s sprawling Olympia City development appears to be running into some problems. Moeun Nhean

Reaching for the sky has its limits at Olympia

As the real estate market barrage takes on a lulling pace, high-profile developments are slowing down in tandem. Olympia City recently confirmed that its initial plan of building the tallest residential building in the country has now been forced to take several floors back, due to a rising concern regarding profit return.

The sprawling, 11-hectare multi-use project is being developed by Overseas Cambodian Investment Corporation (OCIC), whose operations manager, Meng Chamroeun, said that the tallest building within the complex will now have 20 storeys cut from its originally planned 65 storeys. Another 45-storey building will also not be spared, and will now only total 38 floors.

Despite the reduction of the number of floors, the masterplan for the development – which includes an unspecified total number of buildings – is to be kept intact, Chamroeun elaborated.

“This storey-cutting plan is due to the unstable real estate market and the concern of profit return,” he said. “Nonetheless, we are not yet 100 percent sure of setting a certain number of storeys to these buildings.”

He explained that if the market picked back up, the company would revert to the original blueprint.

The groundbreaking for the two scaled down buildings is expected to be finished by 2020.

Olympia City’s 45-storey building now will be used as an office building, while the 38-storey one will house a 5-star hotel. Other buildings of shorter stature within the compound will play host to a shopping mall, restaurants, condos, and entertainment facilities.

Touch Samnang, OCIC’s vice-president, refused to comment, only giving the figure of approximately $500 million with regards to how much the company had invested on construction thus far.

Michael Nhim, head of investment group SIDO in Asia Pacific, commented that the real estate market in Cambodia has been showing great signs of a slow down because of the trickling fund flow from Chinese, Korean, Japanese and Taiwanese investors due to the tightening of laws from their respective governments.

While it is only logical to keep to original blueprints and master plans, instead of following the ebb and flow of market conditions such as that outlined by OCIC’s Chamrouen, it seems that some real estate experts are approving of the move.

Kim Heang, president of Cambodian Valuers and Estate Agents Association, said flexing to the market situation as seen by the company is the right concept.

“OCIC’s decision for now is logical; if the building will not be successful, why bother doing it anyway?” Heang asked. According to Heang, home-buyers now are better informed on what type of property appeals to them, and what their purpose of purchasing a home is – be it for investment or owner-occupier intentions.

“Cutting down the storeys is a good strategy because it helps the company and also the property market so as to avoid even more oversupply problems in this kind of situation.”

MOST VIEWED

  • Siem Reap drain canal now ‘mangrove’ promenade

    A more than half a kilometre long stretch of canal in Siem Reap has been covered and turned into a promenade to attract visitors, said Ly Rasmey, secretary of state at the Ministry of Land Management, Urban Planning and Construction, on September 16. The new pedestrianised

  • Final verdicts for Khmer Rouge leaders ‘vital’ for next generation

    Nearly a decade after the commencement of Case 002/02 against Khieu Samphan back in 2014, the Extraordinary Chambers in the Courts of Cambodia (ECCC) is now set to deliver its final verdict for the former Khmer Rouge head of state. The Supreme Court Chamber of the ECCC,

  • Angkor wildlife, aquarium park still to open October

    The Angkor Wildlife and Aquarium complex about 30km southeast of Siem Reap town with initial total investment of more than $70 million is reportedly still on track for an end-October opening. The park is located on a 100ha plot along National Road 6 in Kbon village, Khchas

  • Railway project studies proceed

    The transport ministry is exploring options to expedite preliminary studies on key public railway infrastructure projects, especially the conversion of the Northern Railway Line that links to Thailand into high-speed rail. Railway freight and passenger transportation has been pinpointed as a major potential engine of

  • Defence minister reaffirms Kingdom’s staunch support for One-China policy

    Minister of National Defence General Tea Banh has reaffirmed Cambodia’s unwavering support for the One-China policy. Tea Banh was speaking at the September 20 ceremonial handover of 117 vehicles and other military equipment donated by China’s defence ministry, held at Phnom Chumreay International Military Training

  • Khem Veasna: The cult leader and the destruction of Cambodian families

    Since the establishment of the League for Democracy Party (LDP) in 2006 under the leadership of Khem Veasna, LDP supporters have gained momentum each year due to his literal speech, ideologies, and his style of appeal to certain groups of Cambodians. Recently, Veasna spurred belief in